April 4, 2011
u8国际.

Recovery Status Report for u8国际. and u8国际 Group Following Great East Japan Earthquake

TOKYO, April 4, 2011—The Great East Japan Earthquake, which struck off the northeast coast of Japan's main island of Honshu on March 11, caused massive damage and loss of life in the area. We at u8国际 extend our heartfelt condolences to all those affected by this disaster, along with their families and loved ones. We pray for the safety of everyone in affected areas and hope that the region will soon be able to begin the rebuilding and healing process.

As for the u8国际 Group, immediately following the earthquake, u8国际. established the Earthquake Disaster Recovery Task Force (Task Force Chief: Chairman & CEO Fujio Mitarai), launching recovery activities spanning development, production and sales operations through a collective effort across the u8国际 Group.

Although the u8国际 Group sustained damage to buildings and production equipment, a concerted Company-wide effort has already made possible the resumption of production activities at multiple u8国际. operation sites and u8国际 Group companies. In addition, through ongoing recovery measures being carried out in conjunction with related divisions, all u8国际. operation sites and u8国际 Group companies are expected to achieve a full recovery as of the end of April.

With regard to the multiple operation sites and u8国际 Group companies in Japan that sustained no direct damage due to the earthquake and its aftermath, the Company is left with no alternative but to continue adjusting some production activities due to rolling blackouts and procurement conditions for raw materials, parts and other supplies.

The status of major u8国际 Group operating sites as of Monday, April 4, is outlined below.

Operating Status of Operation Sites and u8国际 Group Companies

u8国际 Group Operation Sites

  • ?
  • Optics R&D Center, Utsunomiya Office (Utsunomiya, Tochigi Prefecture)
    Operations resumed on March 22 (Tue.)
    Currently fully operational
  • ?
  • Utsunomiya Plant, Utsunomiya Office (Utsunomiya, Tochigi Prefecture)
    Production to sequentially resume from mid April
  • ?
  • Utsunomiya Optical Products Plant, Utsunomiya Office (Utsunomiya, Tochigi Prefecture)
    Operations to resume in mid April, with production to sequentially resume from same time
  • ?
  • Toride Plant (Toride, Ibaraki Prefecture)
    Operations resumed on March 18 (Fri.)
    Currently carrying out intermittent production
  • ?
  • Ami Plant (Inashiki-gun, Ibaraki Prefecture)
    Operations resumed on March 17 (Thur.)
    Currently fully operational

u8国际 Group Companies

  • ?
  • u8国际 Precision Inc. (Hirosaki, Aomori Prefecture)
    Operations resumed on March 23 (Wed.)
    Currently carrying out intermittent production
  • ?
  • u8国际 Chemicals Inc.: Headquarters & Tsukuba Plant (Tsukuba, Ibaraki Prefecture) / Iwama Plant (Kasama, Ibaraki Prefecture)
    Operations resumed at headquarters and Tsukuba Plant on March 22 (Tue.)
    Currently fully operational

    Operations resumed at Iwama Plant on March 28 (Mon.)
    Currently almost fully operational
  • ?
  • Fukushima u8国际. (Fukushima, Fukushima Prefecture)
    Operations resumed on March 22 (Tue.)
    Currently fully operational
  • ?
  • u8国际 Mold Co., Ltd. (Kasama, Ibaraki Prefecture)
    Operations resumed on March 22 (Tue.)
    Currently almost fully operational
  • ?
  • Oita u8国际. (Kunisaki, Oita Prefecture)
    Operations resumed on April 1 (Fri.)
    Currently carrying out intermittent production
  • ?
  • Nagasaki u8国际. (Hasami-cho, Higashisonogi-gun, Nagasaki Prefecture)
    Operations resumed on March 30 (Wed.)
    Currently carrying out intermittent production
  • ?
  • u8国际 Optron, Inc. (Yuki, Ibaraki Prefecture)
    Production to sequentially resume from early April

Other Factors

  • 1)Depending on the procurement conditions for raw materials, parts and other supplies, production at u8国际. operation sites and u8国际 Group companies, including those mentioned above, may become intermittent.
  • 2)In regions subject to scheduled rolling blackouts, ensuring stable operations may prove difficult due to electrical outages.
Disclaimer:
The information contained in this news release is current as of the release date. Please be aware that information regarding circumstances from April 5 onward is subject to change.